
| Tip #1 | Prevent edging joint separation with this simple trick. Cut back the top tube of your edging 4 to 6”. Couple the edging together allowing the flat edges to overlap. Install the stake through this overlap to secure the pieces together. |
| Tip #2 | When selling concrete paver jobs give approximate dimensions for the project. This allows your crew to widen or narrow the project an inch or two to the last full course, to give a finished, crisp look to the project, as well as minimizing the cutting. |
| Tip #3 | When buying nursery stock remember anything that is bought ‘healed in’ should be planted and watered as soon as possible to prevent transplant shock. |
Please check back for NEW tips